Skip to main content

Written by Amalia Cook 

Track Day 22nd March 2026 

The team recently had a successful testing at Sydney Motorsports Park that provided our suspension system with valuable data.  

To successfully collect data, we used two experienced drivers and had the privilege of having two alumni in attendance to offer help and guidance throughout the day. We also tested the car on three different track layouts; a competition spec hairpin, offset slalom, and tight slalom. This decision to use a number of layouts was to ensure the consistency of the car across different circumstances. The testing was split into two different portions.  

The first portion of the day was dedicated to the collection of data related to the set up and designed conditions of the car for the suspension system. This included the investigation of factors such as scrub radius and Ackermann so the team can gain a better, more complete understanding of the impact of certain design decisions and how these decisions affect the car.  

Portion two of the day was originally dedicated to IMU vehicle data collection of varying ARB positions to better understand the ideal balance of the front of the car, in order to view the collaboration between the understeer and oversteer tendencies. However, the team faced another issue with the IMU that could not be fixed on track, postponing the IMU vehicle data collection for another testing day. 

Overall, despite facing technical challenges with the IMU testing, this track day was still a massive success. As the team gained quite a bit of valuable data for the suspension system, that will contribute to their ongoing designs for this year’s car.  

Rachel George

Author Rachel George

More posts by Rachel George

Leave a Reply